Installation Date: December 2025 –
Location: Chiba City, Chiba Prefecture
Model: 1 kW (stand‑alone power supply)
Number of Units: 1 unit
Total Output: 1 kW
Application: Power supply for portable power stations
The system is intended to provide electricity for facility operations.