KDDI (au) Mobile Base Station (Tanabe City, Wakayama Prefecture)

Installation Date: December 2024 –
Location: Tanabe City, Wakayama Prefecture
Model: 1 kW (solar + battery stand‑alone power system)
Number of Units: 1 unit
Total Output: 1 kW
Application: Backup power supply for the mobile base station during disasters

The turbine is installed using the mobile base station tower and serves as a backup power source for charging the base station batteries when the power infrastructure is disrupted during emergencies.
Under normal conditions, it operates as a hybrid system with solar power, contributing to energy savings by supplying commercial power for battery charging.