Date of installation:July 2022~
Location:Kitakyushu City, Fukuoka
Type of model:9kW machine(3-unit configuration/Grid-connected type)
Yun5th+HanoBU2+YasukawaPCS(Independent energy storage system type)
Yun5th+HanoHV3+Battery(Yun5th or Generator for HOKUTO 3rd)
Number of units:1 unit
Total output:9kW
Purpose:New Generator、Field testing of the new control system's grid connection and independent energy storage system
Changed from a 3k lens wind turbine to a new 9kW multi-lens wind turbine.