Installation Date: September 2024 –
Location: Iyo City, Ehime Prefecture
Model: 1 kW (800 W solar hybrid + battery storage)
Number of Units: 1 unit
Total Output: 1 kW
Application: Used as a power source for lighting within the facility during normal operation,and as an emergency power supply during disasters.
The turbine features a “mikan (mandarin orange)” motif design, reflecting the local character of the region (custom coloring available).
During disasters, it serves as an emergency power source for the community.