Installation Date: May 2023 –
Location: Uruma City, Okinawa Prefecture
Model: 3 kW (stand‑alone power supply)
Number of Units: 1 unit
Total Output: 3 kW
Application: Emergency power supply for a disaster‑preparedness storage facility,charging portable batteries for use with Wi‑Fi and outdoor lighting
The turbine serves as a lifeline for local residents during emergencies.
It continued generating power even when the site was directly hit by a typhoon.