Installation Date: January 2025 –
Location: Cebu Island, Philippines
Model: 9 kW (grid‑connected)
Number of Units: 1 unit
Total Output: 9 kW
Application: Power supply for the factory (renewable energy utilization)
The turbine is installed in a heavy salt‑damage area (within 300 meters of the coastline), where various tests are being conducted for wind resistance and salt‑corrosion durability.
It is designed for regions exposed to typhoons with wind speeds in the 70 m/s class.