Installation Date: August 2023 –
Location: Kurobe City, Toyama Prefecture
Model: 9 kW (grid‑connected)
Number of Units: 1 unit
Total Output: 9 kW
Application: Power supply for the factory and promotion of renewable energy utilization
The turbine continued operating without any issues even after experiencing the Noto Earthquake (seismic intensity 7).
Because the site is close to the coastline, the foundation was elevated by 50 cm as a storm‑surge countermeasure, preventing any impact from tsunami conditions.